Design criteria set for the project require the new roadway to:
A US 17 ACE Basin Parkway Segment 1 rendering shows Construction Phases 1 & 2 roadway cross-sections including widths of medians, lanes, shoulders, and the multi-purpose pathway in Phase 2.
Phase 1 is 3 miles between the Combahee River and Big Estate Road. The roadway will include two twelve-foot lanes in each direction, ten foot shoulders on each side, recoverable slopes to enable correction time for those who may run off of the road, and a 100- foot median separating north and southbound traffic.
Phase 2, between Big Estate Road and Gardens Corner, will offer a five lane section which includes two northbound lanes, two southbound lanes, and center turning lanes with intermittent planted medians. Combining the use of center turning lanes with the planted medians offers the opportunity to make necessary left turns while minimizing the possibility of head-on collisions. A 10 foot wide multi-purpose pathway is also included in this stretch of roadway.


Property of the South Carolina Department of Transportation. Copyright © 2007 www.scdot.org.
Please refer to the SCDOT's Internet Disclaimer for proper usage of this site.