US 17 ACE Basin Parkway

Photo Journal

January 2008

erosion control
January has been a very wet month and erosion control is a project priority. It is important to manage the movement of sediment within the work area. Silt fences around the project area are carefully maintained and monitored to prevent sediment from leaving the project area. Erosion control blankets and sediment tubes line ditches to prevent the movement of sediment along the ditch. Hydro-seeding with a mixture of grass and fertilizer will soon sprout to slow movement of sediment down the embankment slopes.
  • Check out the design renderings for the new Gardens Corner Interchange (US 17 and US 21).

    Renderings - (1.0 Mb - PDF)

    Interchange construction is underway. Go to the monthly Project Updates under Project Approach for more information and work progress.
  • US 17 maps
  • US 17 ACE Basin Parkway Segment 1 Newsletter
  • Newsletter
    newsletter.pdf
    (326Kb)
  • You will need Adobe Reader to view the newsletter.
  • Adobe Reader graphic
  • Project Updates
  • April 2010
The Official Website of the state of South Carolina